Formtech High Bay Extension and Pit

This high bay extension and concrete pit project involved the removal of approximately 3,250 square feet of existing roof construction and the installation of a 26 foot high extension of the area to a finished building height of 57 feet.  Work required to complete the new, higher bay within the existing facility includes foundations, structural steel, siding and roof decking, single ply roofing, concrete floor slab removal and replacement, power to relocated lighting and new circuits.

A new 18 foot deep, 20 ft. by 40 ft. concrete pit was installed under the roof extension. It is composed of reinforced concrete wall and floor construction.

Project Location:

Royal Oak, Michigan

Size:

Production 5,000 SF Renovation

Use:

Press Production

Owner:

HHI/ Formtech
Royal Oak, MI

Architect:

Prime Design Systems, Inc. Warren, MI