Roncelli was hired to configure new construction to create an Electric Vehicle Test Room. The fit-out included creating space for the install of the crane and new DYNO and equipment for the electric vehicle testing. The existing floor was sawcut and excavated to make space for a new inertia mass. This was set on springs approximately 2″ above the underground slab before the dyno equipment was installed. The fit out also included a drive cabinet room buildout to house all of the UTAC electrical equipment as well as modifications to the control and engine rooms.