As part of DTE Energy’s Workplace Transformation Initiative (WTI) plan the General Office Auditorium needed a lighting update. Roncelli removed the existing ceiling light system and installed new framing for the new system. An acoustical gypsum ceiling utilizing BASWA product was installed as well as new down lighting and up lighting with new controls. The scope also included painting the drywall for the new lighting system.