Skip to content
DTE Energy Workplace Transformation Initiative

Client

DTE Energy

Location

Detroit, Mich.

Market

Size

Walker Cisler Building 2nd, 6th, 10th, 11th, 16th, 17th, 18th, 19th, 20th & 21st Floors Renovation
23,500 SF per floor

Service Building 2nd, 3rd, 4th, 5th, 6th Floors & Basement Renovation
28,000 SF per floor

System Operations Center
2nd & 3rd Floors Renovation
28,000 SF per floor

General Office 1st, 2nd, 3rd, 4th, 5th, & 6th Floors Renovation
28,000 SF per floor

627,000 SF Total to date

Delivery Methods

General Contracting

Roncelli was selected by DTE Energy through a qualifications-based procurement process to successfully transform their existing office space at their downtown Detroit Campus. Floor renovations were made to the Walker Cisler Building, the Service Building, the Systems Operations Center, and the General Office Building. Each floor typically runs on a 12 week project schedule. On average, Roncelli manages 4 – 5 projects simultaneously throughout the year.

These phased projects consist of complete demolition and abatement of existing office areas to create new open work station environments. This includes Conference and Training rooms, informal collaborative space and Café area on each floor. All new building systems are provided on each floor including

HVAC, plumbing, sprinkler, fire proofing, lighting, power, data, fire alarm and security.
Project challenges include the management of multiple, simultaneous phases of construction involving select demolition, renovations, temporary use and final use areas in a busy work environment. Great care is taken to minimize disruption to ongoing operations and building occupants.

Since DTE Energy implemented their Workplace Transformation Initiative in 2014, Roncelli has renovated 24 floors totaling 627,000 SF to date. Roncelli continues to renovate additional floors throughout the four main buildings at their Detroit Campus.

Related Projects

FCA Warren Truck Assembly Metering Facility

Project name
FCA Warren Truck Assembly Metering Facility
Location
Warren, Mich.
Size
453,500 SF

LGCMI H-Project Battery Manufacturing Facility

Project name
LGCMI H-Project Battery Manufacturing Facility
Location
Holland, Mich.
Size
615,000 SF

City Campus Renovation

Project name
City Campus Renovation
Location
Sterling Heights, Mich.
Size
170,000 SF

Get to know us better

Want to learn more or get started building with us? Fill out the form below and a Roncelli team member will reach out to you shortly!