Skip to content
Universal Dearborn Supercenter

Client

Universal Logistics Solutions, Inc. - UTSI Universal Intermodal Services

Location

Dearborn, Mich.

Market

Size

53,400 SF

Delivery Methods

Design-Build
Summary

Roncelli was awarded a design-build contract for the construction of the Universal Dearborn Super Center project, an inter-modal logistics facility, by UTSI Finance Inc.

The project consisted of a 53,400-square-foot, single-story pre-engineered building that houses 13,000 square feet of office space, 40,000 square feet of maintenance and inspection areas on a 59-acre site.

Features of the building include nine truck and trailer service bays, five trailer inspection bays, an office area for 127 logistics operator positions, a conference and break room facility and truck driver locker and shower areas.

Partial demolition and remodeling was required of an existing cross docking building to create an updated six-position cross dock facility. Site work consisted of mass grading, site utilities, storm retention pond, site lighting, site electrical for truck heater facilities as well as security fencing and gates.

Related Projects

DMC Pre-Operative Holding Post-Anesthesia Care Unit

Project name
DMC Pre-Operative Holding Post-Anesthesia Care Unit
Location
Harper University Hospital, Detroit, Mich.
Size
13,000 SF

LINC I-94 Industrial Park Logistics Facility

Project name
LINC I-94 Industrial Park Logistics Facility
Location
Detroit, Mich.
Size
555,000 SF

Joe Muer Seafood Restaurant Renovation

Project name
Joe Muer Seafood Restaurant Renovation
Location
Bloomfield Hills, Mich.
Size
11,350 SF

Get to know us better

Want to learn more or get started building with us? Fill out the form below and a Roncelli team member will reach out to you shortly!