Beaumont 6th Floor West Bed Tower Build Out

Roncelli, Inc. was selected as the Construction Manager for Beaumont Troy’s build out of their new Post-Operative Orthopedic Patient Area in their new West Tower. The new 44 bed unit occupies the entire 44,000 SF at Beaumont’s Troy’s campus. In addition to the typical support spaces for a medical surgical space, this unit also includes an orthopedic gym. Recent high occupancy rates at Beaumont Troy have increased the need for additional beds.

Special attention was given to the floor areas below the new recovery suites, with regards to planning and scheduling all work in these active areas with hospital management and departmental staff. The goal was to eliminate disruptions to patient care and comfort. Continual management of Beaumont’s Interim Life Safety Plan and Epidemiology Control Plan ensure that patient risk was minimized. All utility work, shut downs and change overs were scheduled at times that presented the least possible interruption to hospital operations. All work was completed within an eight month duration employing a schedule that managed two phases of construction.

Project Location:

Troy, Michigan

Size:

44,000 SF
Building Area

Use:

Medical Surgical Nursing Unit
Central Nurse POD
Post Op
Nourishment Stations
Orthopedic Gym
Visitor Lounge
Family Center / Break Area
Staff Support Offices
Sterile/Soiled Linen Storage

Owner:

Beaumont Health System
Troy, MI

Architect:

Harley Ellis Devereaux Southfield, MI